A house as
a system.
A versioned path from acquisition to operation: design, permits, execution, quality evidence, building services, Smart Home, commissioning and the first year of use.
Project state.
Progress is derived from dependencies, acceptance gates and evidence — not an arbitrary construction percentage.
- Overall
- 7%
- plot → stabilisation
- Phase
- 02 / 13
- programme + design
- Process
- 746
- control points
- Hard gates
- 196
- blocking release
- Smart Home
- 263
- across lifecycle
- Knowledge
- 421
- topics
What actually drives the build.
The public surface promotes only what is ready, active or blocking. Full operational state remains in private Control.
Active queue
3 itemsDecision log
freeze before executionStrip foundations vs raft — after geotechnics and structural review
due P02Mechanical ventilation / heat recovery — route architecture
due P02Home-automation topology and technical rack
due P02Knowledge at the decision point.
Every deep dive is tied to timing, acceptance and evidence. The field manual is not a detached encyclopedia.
Pre-pour gate
One of the most expensive defect classes is discovering an error only after the structural element has been cast.
Hidden-works evidence
Every element that becomes inaccessible after the next trade should leave a traceable proof of execution.
External joinery acceptance
Window performance depends on support, fixing, seals and the insulation interface, not only the profile specification.
MEP coordination before construction
Service clashes with structure belong in the model and drawings, not under a hammer on site.
Change control
Every post-freeze change receives a cost delta, schedule delta and affected-system list.
Quote normalisation
Compare scope to scope, never price to price.